25th April 2022
Botswana Diamonds PLC
("Botswana Diamonds", "BOD" or the "Company")
Thorny River Open Pit Mining Evaluation
Botswana Diamonds, the London AIM and BSE listed diamond explorer, is pleased to announce the results of a conceptual open pit mine optimisation evaluation ("Evaluation") on the River Blow on its Thorny River property ("the Property") in South Africa.
Highlights
· An analysis of the River Blow and its extension indicates potential open pit options.
· Assuming mid-range diamond values of $170/ct, mid-range mining costs, a discount rate of 10%, a recovered grade of 40cpht and 1.7M tons of kimberlite mined indicates that a mine is likely to be commercial.
· The results exclude any additional resources from adjacent targets which will be drilled in the coming months.
Managing Director, James Campbell commented: "The purpose of this exercise was to determine whether there was commercial potential in the Thorny River discoveries. The conceptual open pit evaluation shows that even at low revenue factors the kimberlite is potentially commercial when applying current industry standard mining and processing costs. This exercise will be updated following drilling on the adjacent high priority targets".
Chairman, John Teeling commented: "The Evaluation shows that there is potential for an open pit mine at Thorny River and that there is the potential for operational positive cash flow even at low levels of diamond recovery. We will continue to work on the project including determining the capital cost. We anticipate that drilling in the coming months will extend mineable kimberlite volume".
Details
The Evaluation was completed by South African-based independent mining advisory consultants, Practara (Pty) Ltd, together with modelling input from ABGM Pty Limited of Australia. Conceptual open pit mine plan models were developed under a number of scenarios to assess the open pit mining potential of the River and River Extension blows (collectively "the River"). The models used the results of several drilling programmes. Grade and diamond value data was based on previous microdiamond and bulk sampling data as well as production results from the adjacent Klipspringer mine and the Technical Economic and Evaluation Report ("TEE Report") on the Thorny River Project as announced in June 2018 (and which was a pre-scoping study analysis). Cost data was benchmarked against similar operations.
Shareholders should note that the Evaluation is preliminary in nature and was prepared from drilling and geophysical modelling results and on which no resource has yet been declared. The Evaluation is purely conceptual and indicative of what could potentially be considered for more detailed work. The Evaluation is based on pre-tax illustrative estimates of cashflow before provision of capital expenditure or pre-production costs and which have not yet been determined. The objective of the Evaluation was to identify the best open pit mining option and considered low, medium, and high-cost scenarios for mining.
The following graphic http://www.rns-pdf.londonstockexchange.com/rns/1086J_1-2022-4-22.pdf depicts the Evaluation's open pit models with the kimberlite for reference, based on various revenue factors, for a mid-range ('medium') cost mining operation applicable to a deposit of this nature.
The following are the illustrative results of the medium-cost scenario in the Evaluation at a mid-range diamond value of $170/ct and a discount rate of 10%. Grade and diamond values are stated at a bottom cut-off of +1mm.
Open Pit Ore | Open Pit Waste | Strip Ratio | Average Grade Recovered | Discounted Cashflow NPV(10%) (Excluding capex and taxation) |
Tonnes | Tonnes | Tw:To | cpht | US$'M |
1,187,334 | 2,286,459 | 1.93 | 20 | US$78.5 |
1,601,003 | 3,774,640 | 2.36 | 30 | US$94.5 |
1,702,550 | 4,559,875 | 2.68 | 40 | US$97.1 |
1,743,335 | 5,031,522 | 2.89 | 50 | US$97.8 |
1,754,394 | 5,197,872 | 2.96 | 60 | US$97.9 |
The TEE stated that the kimberlite exploration target at Thorny River area has a grade of between 46 and 74 cpht and diamond value of between $120-220/ct at a bottom cut off of +1mm. For the purposes of the Evaluation, a lower grade of 20 cpht was also considered. The River medium-cost scenario mining model shows positive operational cash flow net present values for potential future open pit exploitation options at a conceptual level. Any open pit that is formed on the basis of a low revenue assumption (i.e. at revenue factors less than 80%) coupled with the maximum open pit size are indicated to be commercial. Additional survey work and in particular geological work to better understand the level of dilution is required to further optimise these conceptual mine models. In the high-cost scenario, an average grade recovery of only 20 cpht would not be economic.
The scenarios examined exclude any benefit of the Company's new contiguous targets which were identified through a recent ground geophysics exercise and are indicative of additional kimberlite blows. Drilling of these targets has the potential to add volumes and impetus to a 'hub and spoke' mining model and this is scheduled for the dry Southern African winter season. Following this, the mine plan will be updated, and the capital expenditure assessed. Subsequently, it is expected that mine permitting will then be sought.
______ _______________
Qualified Person
This release has been approved by James Campbell, Managing Director of Botswana Diamonds plc, a qualified geologist (Pr.Sci.Nat), a Fellow of the Southern African Institute of Mining and Metallurgy, the Institute of Materials, Metals and Mining (UK) and the Geological Society of South Africa and who has over 35-years' experience in the diamond sector.
Practara (Pty) Ltd has reviewed the information in this announcement which has been derived from the Evaluation and has confirmed that the information so presented is balanced and complete and not inconsistent with the Evaluation.
______
This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014. The person who arranged for the release of this announcement on behalf of the Company was James Campbell, Director.
A copy of this announcement is available on the Company's website, at www.botswanadiamonds.co.uk
Enquiries:
Botswana Diamonds PLC James Campbell, Managing Director Jim Finn, Director |
+353 1 833 2833 +27 83 457 3724 +353 1 833 2833 |
Beaumont Cornish - Nominated Adviser Roland Cornish |
|
Beaumont Cornish Limited - Broker Felicity Geidt | +44 (0) 207 628 3396 |
First Equity Limited - Joint Broker
| +44 (0) 207 374 2212 |
BlytheRay - PR Said Izagaren Naomi Holmes | +44 (0) 207 138 3206 +44 (0) 207 138 3553 +44 (0) 207 138 3206 +44 (0) 207 138 3206 +44 (0) 207 138 3206 |
Teneo Luke Hogg Alan Tyrrell Ross Murphy |
+353 (0) 1 661 4055 +353 (0) 1 661 4055 +353 (0) 1 661 4055 |
Glossary
"cpht" | Carats per hundred tons |
"NPV" | Pre-tax net present value |
"TW:TO" | Tons waste : tons ore |
Beaumont Cornish Limited, which is authorised and regulated in the United Kingdom by the Financial Conduct Authority, is acting as nominated adviser to the Company in relation to the matters referred herein. Beaumont Cornish Limited is acting exclusively for the Company and for no one else in relation to the matters described in this announcement and is not advising any other person and accordingly will not be responsible to anyone other than the Company for providing the protections afforded to clients of Beaumont Cornish Limited, or for providing advice in relation to the contents of this announcement or any matter referred to in it.
ENDS
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.