THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF THE MARKET ABUSE REGULATION (EU) NO. 596/2014 (INCLUDING AS IT FORMS PART OF THE LAWS OF ENGLAND AND WALES BY VIRTUE OF THE EUROPEAN UNION (WITHDRAWAL) ACT 2018 ("MAR").
12 January 2024
Ferro-Alloy Resources Limited
("Ferro-Alloy" or the "Group" or the "Company")
Q4 2023 Production Results
Sustained or Increased Production Achieved
Ferro-Alloy Resources Limited (LSE:FAR), the vanadium producer and developer of the large Balasausqandiq vanadium deposit in Southern Kazakhstan, announces the production results of the Group's existing operation for Q4 2023.
Q4 Production Results
| 2022 | 2023 |
| ||||||||
| Q1 2022 | Q2 2022 | Q3 2022 | Q4 2022 |
FY 2022
| Q1 2023 | Q2 2023 | Q3 2023 | Q4 2023 | FY 2023 | FY % change |
| | | | | | | | | | | |
Tonnes of concentrate processed | 502.3 | 644.9 | 538.4 | 396.2 | 2,081.8 | 194.1 | 1,016.6 | 314.0 | 703.3 | 2,228.0 | 7.0% |
| | | | |
| | | | |
|
|
Tonnes of vanadium pentoxide produced* | 81.1 | 91.7 | 69.9 | 62.8 | 305.5 | 31.3 | 141.4 | 47.3 | 90.5 | 310.5 | 1.6% |
| | | | |
| | | | |
|
|
Tonnes of molybdenum produced** | 11.3 | 10.4 | 11.0 | 3.3 | 36.0 | 6.5 | 14.1 | 6.4 | 7.4 | 34.4 | -4.4% |
| | | | |
| | | | |
|
|
Tonnes of nickel produced*** | 25.1 | 32.2 | 26.9 | 19.8 | 104.0 | 9.7 | 50.8 | 15.7 | 35.2 | 111.4 | 7.1% |
* partly contained in ammonium metavanadate
** in ferro-molybdenum
*** in nickel concentrate
Production Outlook
As announced on 10 October 2023, in order to secure a regular supply of concentrate, the Company entered into a number of contracts with different suppliers. As a result, the Company is currently holding a significant stock of concentrates, sufficient for around seven months of production at current rates.
The stockpiled concentrates require longer process-residence times than hitherto, so the Company expects that production during the first two quarters of 2024 will be similar to that of Q4 2023. The Company aims to increase production by treating different and higher quality concentrates as they become available.
Commenting on the production results, Nick Bridgen, CEO of Ferro-Alloy Resources said:
"The existing plant is operating well and in spite of the different characteristics we have found with the new concentrates, it's pleasing to report sustained or slightly increased production. Our main task remains to complete the feasibility study into the Balasausqandiq project, the results to date of which meet our previous expectations."
For further information, visit www.ferro-alloy.com or contact:
Ferro-Alloy Resources Limited | Nick Bridgen (CEO) / William Callewaert (CFO) | info@ferro-alloy.com
|
Shore Capital (Joint Corporate Broker)
Liberum Capital Limited (Joint Corporate Broker) | Toby Gibbs/Lucy Bowden
Scott Mathieson/Kane Collings
| +44 207 408 4090
+44 20 3100 2000
|
St Brides Partners Limited (Financial PR & IR Adviser) | Ana Ribeiro / Zoe Briggs | +44 207 236 1177 |
Notes to Editors
About Ferro-Alloy Resources Limited:
The Company's operations are all located at the Balasausqandiq deposit in Kyzylordinskoye Oblast in the South of Kazakhstan. Currently the Company has two main business activities:
a) the high grade Balasausqandiq vanadium project (the "Project"); and
b) an existing vanadium concentrate processing operation (the "Existing Operation")
Balasausqandiq is a very large deposit, with vanadium as the principal product together with several by-products. Owing to the nature of the ore, the capital and operating costs of development are very much lower than for other vanadium projects.
The most recent mineral resource estimate for ore-body one (of seven) provided an Indicated Mineral Resource of 32.9 million tonnes at a mean grade of 0.62% V2O5 equating to 203,364 contained tonnes of vanadium pentoxide ("V2O5"). In the system of reserve estimation used in Kazakhstan the reserves are estimated to be over 70m tonnes in ore-bodies 1 to 5 but this does not include the full depth of ore-bodies 2 to 5 or the remaining ore-bodies which remain substantially unexplored.
The Project will be developed in two phases, Phase 1 and Phase 2, treating 1m tonnes per year and an additional 3m tonnes per year. Production will be some 5,600 tonnes of V2O5 from Phase 1, rising to 22,400 tonnes V2O5 after Phase 2 is commissioned.
There is an existing concentrate processing operation at the site of the Balasausqandiq deposit. The production facilities were originally created from a 15,000 tonnes per year pilot plant which was then expanded and adapted to recover vanadium, molybdenum and nickel from purchased concentrates.
The existing operation is located on the same site and uses some of the same infrastructure as the Project, but is a separate operation which will continue in parallel with the development and operation of the Project.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.